Cold Weather Welding

The Welding Shop Calgary was called to weld this huge 5ft diameter pipe used do mitigate heavy water runoff.

The pipe when fully created will run under an existing highway and  redirect heavier than usual spring run off.

Cold weather is not the most optimal time to be welding but The Welding Shop persisted to get the job done.

For more information on how to manage big cold weather welding projects, get in touch or give us a call. 403-273-7717.
.